Renishaw – There is a temporary work site on the TPT to the south of Barlborough Road Bridge at Renishaw. At present there are trucks using a short section of the Trail as a haul route, but there is a diversion along the Cuckoo Way for walkers and cyclists. Horse riders should be assisted by banksmen on site. This is a maximum four week scheme.
Hollingwood – The TPT is currently closed due to construction works at the former Hollingwood Lock House. This a five week contract, and the Trail will be re-opened for use once the works are complete. There is currently no diversion available due to the restricted nature of the site.